Description: The electrical work used FY 2005 Construction appropriation funds. Construction funds were used to complete the design and installation of two new generators, transformers, and switch gear, as well as the connection of this new equipment to the existing electrical distribution system.
|
|
|
USFWS (129284779) |
$2,662 |
Project Level (28XX) |
Federal |
PO Box 50167
Honolulu,
HI
|
|
Citation
|
Source:
Appropriations Statute
|
Reference:
P.L. 108-447 & H. Rept. 108-792
|
Method:
User entered excerpt
|
Citation Excerpt: "The conference agreement provides $53,400,000 for construction instead of $48,400,000 as proposed by the House and $37,136,000 as proposed by the Senate. The managers agree to the following distribution of funds:'"
|
|
|