Description: Project constructs 440,000 gallons of aboveground and 80,000 gallons of underground fuel oil bulk storage tanks with secondary containment, insulation, air filtering system, heating systems and internal and external piping. Construction also includes rehabilitation of the existing fuel delivery area and installation of fuel piping from the new tanks to the Building 7CC service fuel tank areas. Construction includes demolition of the two (2) existing 840,000 gallon concrete underground storage tanks and all appurtenances including piping.
|
|
|
Naval Station Newport |
$5,490 |
|
Federal |
Newport,
RI
|
|
Citation
|
Source:
Appropriations Report Language - Conference
|
Reference:
108-773
|
Location:
Page 80 under Rhode Island
|
Citation Excerpt: Bulk Fuel Storage Tank (Rhode Island)
|
|