Description: Modify existing drydock electrical systems to provide permanent power to ships undergoing repair at Drydock 4. Provide tunnels to enable cable connections between drydock outlets and industrial equipment without crossing crane rails. Provide permanent emergency generation systems for drydock drainage pumps and emergency loads.
|
|
|
NAVSHIPYD AND IMF |
$5,100 |
|
Federal |
Pearl Harbor,
HI
|
|
Citation
|
Source:
Appropriations Report Language - Conference
|
Reference:
108-773
|
Location:
Page 73 under Hawaii
|
Citation Excerpt: Drydock 4 Shorepower Improvements (Hawaii)
|
|